Project Overview:

In September of this year Dustrol was performing Coldmilling on US-400/US-50 in both Gray and Ford Counties in Kansas.  The project was 21 miles long and ended in Dodge City after passing the Boot Hill Casino.  It consisted of milling 2″ of asphalt while the asphalt contractor paved back that same amount the same day.  The project went smoothly even with a few challenges like the single entrance to the casino needing milling also.

Process

Coldmilling 2" on Driving Lanes

Location

US-400/US-50 near Dodge City, KS

Size

21 Mile Project 25' wide