Project Overview:

We returned to Arkansas in 2025 Northeast of Little Rock near Bald Knob. The project was a 2″ HIR job on a 4 lane with turn lanes on US-167. Our crew recycled 26′ wide on both the northbound and southbound lanes. The center turn lane and shoulders were not recycled and were overlaid with hotmix along with the driving lanes.

Dustrol was a subcontractor on the project to Atlas Asphalt .

Process

2" Hot In-Place Recycle

Location

US-167 Near Bald Knob, AR

Size

12 Mile Project, 4 Lanes 13' Lanes